• Home
  • Who We Are

    Who We Are

    Company Profile
    QHSE
    Corporate Honors
    Organizational Structure
  • What Can We Do

    What Can We Do

    R&D
    Engineering
    Industry
    Project Value Added Services
  • What Did We Do

    What Did We Do

    Coal Chemical
    Salt Chemical
    New Chemical Material
    GAS
    Innovative Technology
    Petrochemical
    Environment Protection and Infrastructure
    Power&Energy
  • What We Believe

    What We Believe

    Corporate Mission
    Strategic Positioning
    Corporate Vision
    Core Values
    Corporate Vision
  • Our Responsibility

    Our Responsibility

  • News

    News

CN
CN ES TR AR RU
HomeNews First Units Achieve Mechanical Completion at SABIC Fujian PC&BPA Complex Project

First Units Achieve Mechanical Completion at SABIC Fujian PC&BPA Complex Project

  • ArticleFrom:
  • Date:February 01, 2026
  • Share:

  Recently, the cumene unit and other first-phase installations of the SABIC Fujian PC&BPA Complex Project, EPC-contracted by CNCEC-TCC, have achieved mechanical completion ahead of schedule. This milestone marks that the relevant units have fully transitioned from the installation phase to the system commissioning and production preparation stage, laying a solid foundation for the subsequent high-quality interim handover and project commissioning.

5.福建中沙古雷PC&BPA联合装置项目首批装置机械完工


  The PC&BPA Complex is the core part of the SABIC Fujian Gulei Ethylene and Downstream Deep Processing Complex Project, with the longest process flow and the largest number of equipment. Since the project commencement, the CNCEC-TCC project team has always adhered to the philosophy of “Safety First, Quality Oriented, Schedule Focused, Compliance Based”. Aiming to win the National High-Quality Project Award, the team has collaborated efficiently with all participating units, allocated high-quality resources in a scientific manner, and successfully overcome a series of challenges including special material welding, large module hoisting, and intensive cross-disciplinary construction.  

  Faced with multiple challenges such as tight schedule, heavy tasks and high technical requirements, the project team has adhered to Party-building guidance and deepened multi-party joint construction. By setting up Party member responsibility areas, forming Party member vanguard teams, and carrying out themed labor competitions, the team has built a concerted effort featuring “joint organization construction, resource sharing and problem solving together”. All construction personnel have carried forward the fine style of continuous fighting and daring to tackle tough tasks, strictly abided by the bottom lines of safety, environmental protection and quality, and completed the installation of the first-phase units with high standards and high quality, fully demonstrating the professional strength and responsibility of CNCEC-TCC as an excellent EPC contractor.


Previous:
Solid Efforts Usher in a New Chapter, Striving for a Strong Start to the Year | Intermediate Handover! Tianjin Nangang LNG Cold Energy Comprehensive Utilization Demonstration Project Successfully Achieved Intermediate Handover
Next:
60 Days Ahead of Schedule!China’s First Power Central Enterprise-Led LNG Terminal Project Completes Roof Air Raising of Three Storage Tanks
Return
Who We Are
Company Profile
QHSE
Corporate Honors
Organizational Structure
What Can We Do
R&D
Engineering
Industry
Project Value Added Services
What Did We Do
Coal Chemical
Salt Chemical
New Chemical Material
GAS
Innovative Technology
Petrochemical
Environment Protection and Infrastructure
Power&Energy
What We Believe
Corporate Mission
Strategic Positioning
Corporate Vision
Core Values
Corporate Vision
Our Responsibility
News
Friend Links:China National Chemical Engineering Group Corporation (CNCEC)
Copyright © 2026 China Tianchen Engineering Corporation Tianjin ICP Registration No. 05009009-1
Privacy PolicyDisclaimerWebsite Map