• Home
  • Who We Are

    Who We Are

    Company Profile
    QHSE
    Corporate Honors
    Organizational Structure
  • What Can We Do

    What Can We Do

    R&D
    Engineering
    Industry
    Project Value Added Services
  • What Did We Do

    What Did We Do

    Coal Chemical
    Salt Chemical
    New Chemical Material
    GAS
    Innovative Technology
    Petrochemical
    Environment Protection and Infrastructure
    Power&Energy
  • What We Believe

    What We Believe

    Corporate Mission
    Strategic Positioning
    Corporate Vision
    Core Values
    Corporate Vision
  • Our Responsibility

    Our Responsibility

  • News

    News

CN
CN ES TR AR RU
HomeNews 35kV Substation of the PC Unit in the SABIC Fujian PC&BPA Complex Project Successfully Energized and Achieved Intermediate Handover

35kV Substation of the PC Unit in the SABIC Fujian PC&BPA Complex Project Successfully Energized and Achieved Intermediate Handover

  • ArticleFrom:
  • Date:February 03, 2026
  • Share:

  Recently, the SS80100 35kV substation of the PC unit in the SABIC Fujian PC&BPA Complex Project, EPC-contracted by CNCEC-TCC, successfully achieved one-time energization and completed a high-standard intermediate handover simultaneously. As the third key power facility, following the substation of the phenol/acetone unit and the SS80200 substation of the PC unit, to achieve both successful power receiving and intermediate handover, its successful commissioning marks continuous and significant progress in the project's power system construction, laying a solid foundation for the subsequent commissioning of the entire complex.

3. 中沙古雷PC&BPA联合装置项目PC装置35kV变电所受电成功并同步实现中交1


  As one of the core power supply units for the PC unit, the SS80100 Substation undertakes the critical task of providing stable power supply to key process units and utility auxiliary facilities including CO, DPC, DMC, flare, natural gas compression, methanol raw material tank farm and No.3 intermediate tank farm. To achieve the goal of "Energization upon Intermediate Handover", the project team of CNCEC-TCC collaborated efficiently and made thorough arrangements with the owner, supervision and all construction parties. In strict accordance with the integrated plan for energization and handover, the full-process preparations were completed, ranging from equipment installation and calibration, protection setting calculation, insulation testing to final confirmation of safety conditions, ensuring that all procedures met high-standard delivery requirements. During the energization, unified on-site command was implemented and operators cooperated seamlessly to complete a series of key steps in sequence, including line impact, test busbar energization and transformer commissioning. The whole procedure proceeded smoothly and orderly, with the system successfully energized on the first attempt. All equipment operated normally with stable parameters, fully realizing the synchronous completion of energization and intermediate handover.

3. 中沙古雷PC&BPA联合装置项目PC装置35kV变电所受电成功并同步实现中交2


  The successive achievement of "Energization upon Intermediate Handover" for the project’s three key power facilities is a vivid practice of the CNCEC-TCC project team in continuously deepening lean management. It not only provides immediate guarantee for the power supply of related process units, but also creates favorable conditions for the subsequent system linkage commissioning and the overall progress of the project. Guided by the corporate mission of "Building a Colorful World, Creating a Better Life", the CNCEC-TCC project team will continue to take the successful commissioning of these substations as a driving force, push forward all follow-up construction work with high standards and high quality, and ensure the project is completed and delivered on schedule.

Previous:
Inner Mongolia Hengkun LNG Project Completed Concrete Pouring of Tank Foundation Roof Slab
Next:
Solid Efforts Usher in a New Chapter, Striving for a Strong Start to the Year | Intermediate Handover! Tianjin Nangang LNG Cold Energy Comprehensive Utilization Demonstration Project Successfully Achieved Intermediate Handover
Return
Who We Are
Company Profile
QHSE
Corporate Honors
Organizational Structure
What Can We Do
R&D
Engineering
Industry
Project Value Added Services
What Did We Do
Coal Chemical
Salt Chemical
New Chemical Material
GAS
Innovative Technology
Petrochemical
Environment Protection and Infrastructure
Power&Energy
What We Believe
Corporate Mission
Strategic Positioning
Corporate Vision
Core Values
Corporate Vision
Our Responsibility
News
Friend Links:China National Chemical Engineering Group Corporation (CNCEC)
Copyright © 2026 China Tianchen Engineering Corporation Tianjin ICP Registration No. 05009009-1
Privacy PolicyDisclaimerWebsite Map