• Home
  • Who We Are

    Who We Are

    Company Profile
    QHSE
    Corporate Honors
    Organizational Structure
  • What Can We Do

    What Can We Do

    R&D
    Engineering
    Industry
    Project Value Added Services
  • What Did We Do

    What Did We Do

    Coal Chemical
    Salt Chemical
    New Chemical Material
    GAS
    Innovative Technology
    Petrochemical
    Environment Protection and Infrastructure
    Power&Energy
  • What We Believe

    What We Believe

    Corporate Mission
    Strategic Positioning
    Corporate Vision
    Core Values
    Corporate Vision
  • Our Responsibility

    Our Responsibility

  • News

    News

CN
CN ES TR AR RU
HomeNews The World’s Tallest Under-Construction Coal-Water Slurry Gasification Framework Successfully Completes Civil Capping

The World’s Tallest Under-Construction Coal-Water Slurry Gasification Framework Successfully Completes Civil Capping

  • ArticleFrom:
  • Date:November 11, 2025
  • Share:

  Recently, the civil engineering capping of the gasification framework for the gasification unit of the China Coal Yulin Phase II Project, which is under the EPC general contract of CNCEC-TCC, has been successfully completed. The achievement of this milestone marks the official transition of the project construction from the civil construction phase to the equipment installation phase, laying a solid foundation for the subsequent project construction.

  As the "energy heart" of the gasification unit of the China Coal Yulin Phase II Project, the two gasification frameworks have a building height of 105 meters, making them the world's tallest under-construction coal-water slurry gasification frameworks, with their design and construction at the industry-leading level. To address the challenge of high-altitude concrete pumping at 105 meters, the technical team of CNCEC-TCC innovatively adopted a "graded pumping + ultra-high pressure delivery pipe" construction plan, using special high-pressure-resistant delivery pipes to effectively avoid problems such as concrete segregation and pipeline blockage, ensuring continuous and stable pouring throughout the process. Facing the safety risks of high-altitude operations at 105 meters, the project team built a full-process safety management system that "covers all aspects horizontally and reaches all levels vertically", strictly implemented the safety production responsibility system, and fully promoted the dual prevention mechanism of "risk classification management and control + hidden danger investigation and management", ensuring "zero safety accidents and zero casualties" in project construction.


10.22.png

Previous:
60 Days Ahead of Schedule!China’s First Power Central Enterprise-Led LNG Terminal Project Completes Roof Air Raising of Three Storage Tanks
Next:
Ranked for 21 Consecutive Years! CNCEC-TCC’s 2025 ENR Ranking Hits a New High
Return
Who We Are
Company Profile
QHSE
Corporate Honors
Organizational Structure
What Can We Do
R&D
Engineering
Industry
Project Value Added Services
What Did We Do
Coal Chemical
Salt Chemical
New Chemical Material
GAS
Innovative Technology
Petrochemical
Environment Protection and Infrastructure
Power&Energy
What We Believe
Corporate Mission
Strategic Positioning
Corporate Vision
Core Values
Corporate Vision
Our Responsibility
News
Friend Links:China National Chemical Engineering Group Corporation (CNCEC)
Copyright © 2026 China Tianchen Engineering Corporation Tianjin ICP Registration No. 05009009-1
Privacy PolicyDisclaimerWebsite Map