• Home
  • Who We Are

    Who We Are

    Company Profile
    QHSE
    Corporate Honors
    Organizational Structure
  • What Can We Do

    What Can We Do

    R&D
    Engineering
    Industry
    Project Value Added Services
  • What Did We Do

    What Did We Do

    Coal Chemical
    Salt Chemical
    New Chemical Material
    GAS
    Innovative Technology
    Petrochemical
    Environment Protection and Infrastructure
    Power&Energy
  • What We Believe

    What We Believe

    Corporate Mission
    Strategic Positioning
    Corporate Vision
    Core Values
    Corporate Vision
  • Our Responsibility

    Our Responsibility

  • News

    News

CN
CN ES TR AR RU
HomeNews Successful Installation of the Dome of the 120,000-Cubic-Meter Cryogenic Ethane Storage Tank for Vietnam Long Son Project

Successful Installation of the Dome of the 120,000-Cubic-Meter Cryogenic Ethane Storage Tank for Vietnam Long Son Project

  • ArticleFrom:
  • Date:November 11, 2025
  • Share:

  Recently, the dome lifting operation of the 120,000-cubic-meter cryogenic ethane storage tank for the Vietnam Long Son Project, which is undertaken by CNCEC-TCC as the general contractor, has been successfully completed, laying a solid foundation for the subsequent installation and construction of the project.

  The dome lifted this time is one of the core components of the storage tank, with a module weight of approximately 18 tons. Facing challenges such as high difficulty in lifting and continuous rainfall, the project team of CNCEC-TCC quickly formed a special task force, established a 24-hour meteorological monitoring and early warning mechanism, conducted surveys and planning of the crawler crane's travel route weeks in advance, and coordinated all parties to clear route obstacles and optimize the operation process, laying a solid foundation for the on-schedule lifting of the dome. After 7 days of day-and-night hard work and precise cooperation, 24 pieces of "steel sky" were accurately connected inside the storage tank, with the overall installation error controlled at the millimeter level. The lifting task was completed with high standards, fully demonstrating CNCEC-TCC's outstanding technology and efficient execution capability in the construction of large-scale cryogenic storage tanks.

 The successful completion of this milestone has created favorable conditions for the subsequent internal tank installation and construction of the project.

10.4.png

Previous:
Guo Guihe Attends the Project Award Ceremony and Senior Management Promotion Meeting at the China Gulei Project
Next:
The World’s Largest Single-Unit Acetic Acid Production Complex Successfully Achieves Mechanical Completion and Handover
Return
Who We Are
Company Profile
QHSE
Corporate Honors
Organizational Structure
What Can We Do
R&D
Engineering
Industry
Project Value Added Services
What Did We Do
Coal Chemical
Salt Chemical
New Chemical Material
GAS
Innovative Technology
Petrochemical
Environment Protection and Infrastructure
Power&Energy
What We Believe
Corporate Mission
Strategic Positioning
Corporate Vision
Core Values
Corporate Vision
Our Responsibility
News
Friend Links:China National Chemical Engineering Group Corporation (CNCEC)
Copyright © 2026 China Tianchen Engineering Corporation Tianjin ICP Registration No. 05009009-1
Privacy PolicyDisclaimerWebsite Map