• Home
  • Who We Are

    Who We Are

    Company Profile
    QHSE
    Corporate Honors
    Organizational Structure
  • What Can We Do

    What Can We Do

    R&D
    Engineering
    Industry
    Project Value Added Services
  • What Did We Do

    What Did We Do

    Coal Chemical
    Salt Chemical
    New Chemical Material
    GAS
    Innovative Technology
    Petrochemical
    Environment Protection and Infrastructure
    Power&Energy
  • What We Believe

    What We Believe

    Corporate Mission
    Strategic Positioning
    Corporate Vision
    Core Values
    Corporate Vision
  • Our Responsibility

    Our Responsibility

  • News

    News

CN
CN ES TR AR RU
HomeNews Steel Space Frame Topping-Out Achieved for CNCEC-TCC's First EPC-Contracted Circular Stockyard

Steel Space Frame Topping-Out Achieved for CNCEC-TCC's First EPC-Contracted Circular Stockyard

  • ArticleFrom:
  • Date:August 21, 2025
  • Share:

  Recently, the steel space frame of the circular stockyard in the General Design Institute and Gasification & Auxiliary Facilities Project (Section II, Phase I) of the Utility Island Project at Lianyungang Petrochemical Industrial Base, EPC-contracted by CNCEC-TCC, was successfully topped out. This milestone marks the completion of the main structure of the most challenging, highest-risk, and longest-duration standalone project within the coal storage and transportation system.

  The circular stockyard features a 100-meter diameter and 60-meter height, with a maximum coal storage capacity of 100,000 tonnes. It is the largest coal storage facility of its type in the Utility Island of Lianyungang Petrochemical Industrial Base and represents TCC’s first EPC project incorporating this category of stockyard in a storage-transport system. The main structure adopts a "raft foundation + concrete ring wall + steel lattice shell + single-layer profiled steel sheet" design. The space frame was erected using a "modular block-lifting" construction process, with installation progressing "bottom-up and outward-inward ring by ring", significantly shortening the construction cycle for such facilities.

  As an ultra-hazardous project, the project team and all participating units prioritized strict adherence to safety protocols and quality control. During installation, they overcame adverse factors including spring gales, stringent precision requirements, complex operational environments, and high safety risks. Through united efforts and multifaceted measures, the team successfully completed the steel space frame topping-out milestone, earning high praise from the owner, supervision team, and all stakeholders.

图片15.png

Previous:
CNCEC-TCC’s Quality Training Center for Fujian SABIC PC&BPA Complex Officially Unveiled and Put into Use
Next:
CNCEC-TCC Signs EPC Contract for Bohua Liquid Bulk Terminal (Storage Area) Project in Tianjin Port Dagang Port Area
Return
Who We Are
Company Profile
QHSE
Corporate Honors
Organizational Structure
What Can We Do
R&D
Engineering
Industry
Project Value Added Services
What Did We Do
Coal Chemical
Salt Chemical
New Chemical Material
GAS
Innovative Technology
Petrochemical
Environment Protection and Infrastructure
Power&Energy
What We Believe
Corporate Mission
Strategic Positioning
Corporate Vision
Core Values
Corporate Vision
Our Responsibility
News
Friend Links:China National Chemical Engineering Group Corporation (CNCEC)
Copyright © 2026 China Tianchen Engineering Corporation Tianjin ICP Registration No. 05009009-1
Privacy PolicyDisclaimerWebsite Map