• Home
  • Who We Are

    Who We Are

    Company Profile
    QHSE
    Corporate Honors
    Organizational Structure
  • What Can We Do

    What Can We Do

    R&D
    Engineering
    Industry
    Project Value Added Services
  • What Did We Do

    What Did We Do

    Coal Chemical
    Salt Chemical
    New Chemical Material
    GAS
    Innovative Technology
    Petrochemical
    Environment Protection and Infrastructure
    Power&Energy
  • What We Believe

    What We Believe

    Corporate Mission
    Strategic Positioning
    Corporate Vision
    Core Values
    Corporate Vision
  • Our Responsibility

    Our Responsibility

  • News

    News

CN
CN ES TR AR RU
HomeNews Successful Test Run of Main Air Compressor for Air Separation Unit in Huayi Synthesis Gas POX Project

Successful Test Run of Main Air Compressor for Air Separation Unit in Huayi Synthesis Gas POX Project

  • ArticleFrom:
  • Date:August 20, 2025
  • Share:

  Recently, the linkage test run of the 29,500 kW main air compressor—the highest-power unit in the Huayi Synthesis Gas Project executed by CNCEC-TCC under an EPC contract—was successfully completed. This achievement marks a breakthrough in critical project milestones, signifying that the equipment commissioning has entered a new phase.

  The test run spanned two days, during which multiple rounds of debugging resolved challenges such as vibration interlock trips and surge curve calibration, laying a solid foundation for the stable operation of the air separation unit. Prior to the test run, a multidisciplinary team led by equipment specialists conducted joint on-site inspections with piping, electrical, and instrumentation departments, achieving zero errors through lean management. The project team ensured pipeline sealing integrity and instrument accuracy met design requirements via pressure testing for leakage detection and signal calibration, providing comprehensive safeguards for the unit’s safe startup.

  The successful completion of this milestone not only verified equipment performance and system integration capabilities but also accumulated valuable experience for subsequent interconnected commissioning of the air separation unit. The Shanghai Huayi POX Project Department will leverage this test run as a new starting point to fully support the owner in advancing commissioning activities. While ensuring smooth mechanical completion, the team will dedicate all efforts to follow-up tasks, aiming to deliver satisfactory outcomes for both the owner and the company.

图片9.png

Previous:
CNCEC-TCC Clinches Dual Honors in International Contracting Awards
Next:
Successful First-Time Energization of 10kV Caustic Soda Substation in Hubei Yihua Caustic Soda Project
Return
Who We Are
Company Profile
QHSE
Corporate Honors
Organizational Structure
What Can We Do
R&D
Engineering
Industry
Project Value Added Services
What Did We Do
Coal Chemical
Salt Chemical
New Chemical Material
GAS
Innovative Technology
Petrochemical
Environment Protection and Infrastructure
Power&Energy
What We Believe
Corporate Mission
Strategic Positioning
Corporate Vision
Core Values
Corporate Vision
Our Responsibility
News
Friend Links:China National Chemical Engineering Group Corporation (CNCEC)
Copyright © 2026 China Tianchen Engineering Corporation Tianjin ICP Registration No. 05009009-1
Privacy PolicyDisclaimerWebsite Map