• Home
  • Who We Are

    Who We Are

    Company Profile
    QHSE
    Corporate Honors
    Organizational Structure
  • What Can We Do

    What Can We Do

    R&D
    Engineering
    Industry
    Project Value Added Services
  • What Did We Do

    What Did We Do

    Coal Chemical
    Salt Chemical
    New Chemical Material
    GAS
    Innovative Technology
    Petrochemical
    Environment Protection and Infrastructure
    Power&Energy
  • What We Believe

    What We Believe

    Corporate Mission
    Strategic Positioning
    Corporate Vision
    Core Values
    Corporate Vision
  • Our Responsibility

    Our Responsibility

  • News

    News

CN
CN ES TR AR RU
HomeNews Successful First-Time Energization of 10kV Caustic Soda Substation in Hubei Yihua Caustic Soda Project

Successful First-Time Energization of 10kV Caustic Soda Substation in Hubei Yihua Caustic Soda Project

  • ArticleFrom:
  • Date:August 20, 2025
  • Share:

  Recently, the 10kV caustic soda substation of Hubei Yihua New Energy Co., Ltd.’s 200 KTA caustic soda relocation and energy-saving renovation project, EPC-contracted by CNCEC-TCC, was successfully energized on the first attempt. This achievement not only laid a solid foundation for subsequent work including single-unit commissioning, electrical and instrumentation equipment testing, and full-plant control system commissioning, but also created favorable conditions for the project’s mechanical completion.

  As the project’s power hub, the caustic soda substation bears the critical responsibility of supplying power to all electrical loads within the facility. Its installation and commissioning faced tight schedules and heavy workloads. Confronted with this pivotal milestone, the project team implemented scientific planning and meticulous deployment, proactively extending working hours to adopt a "7+0" and "day-and-night shift" model. Daily verifications were conducted on the substation’s "three checks and four determinations" and construction punch list items. Ultimately, through the team’s efficient coordination and close collaboration with specialists, the substation energization was successfully completed. 

图片8.png

Previous:
Successful Test Run of Main Air Compressor for Air Separation Unit in Huayi Synthesis Gas POX Project
Next:
Juzhengyuan (Jieyang) Acetic Acid Project 110kV Substation Successfully Energized on First Attempt
Return
Who We Are
Company Profile
QHSE
Corporate Honors
Organizational Structure
What Can We Do
R&D
Engineering
Industry
Project Value Added Services
What Did We Do
Coal Chemical
Salt Chemical
New Chemical Material
GAS
Innovative Technology
Petrochemical
Environment Protection and Infrastructure
Power&Energy
What We Believe
Corporate Mission
Strategic Positioning
Corporate Vision
Core Values
Corporate Vision
Our Responsibility
News
Friend Links:China National Chemical Engineering Group Corporation (CNCEC)
Copyright © 2026 China Tianchen Engineering Corporation Tianjin ICP Registration No. 05009009-1
Privacy PolicyDisclaimerWebsite Map