• Home
  • Who We Are

    Who We Are

    Company Profile
    QHSE
    Corporate Honors
    Organizational Structure
  • What Can We Do

    What Can We Do

    R&D
    Engineering
    Industry
    Project Value Added Services
  • What Did We Do

    What Did We Do

    Coal Chemical
    Salt Chemical
    New Chemical Material
    GAS
    Innovative Technology
    Petrochemical
    Environment Protection and Infrastructure
    Power&Energy
  • What We Believe

    What We Believe

    Corporate Mission
    Strategic Positioning
    Corporate Vision
    Core Values
    Corporate Vision
  • Our Responsibility

    Our Responsibility

  • News

    News

CN
CN ES TR AR RU
HomeNews Shandong Zhongran Baogang Liquefied Hydrocarbon Depot Project Successfully Completed

Shandong Zhongran Baogang Liquefied Hydrocarbon Depot Project Successfully Completed

  • ArticleFrom:
  • Date:August 21, 2025
  • Share:

  Recently, the Shandong Zhongran Baogang Liquefied Hydrocarbon Depot Project, EPC-contracted by CNCEC-TCC, was successfully completed. Deng Pindong, General Manager of Shandong Zhongran Baogang Energy Development Co., Ltd., and Ji Li, Deputy General Manager of CNCEC-TCC, attended the completion ceremony.

  The project team of TCC completed the construction task in 435 days with craftsmanship and dedication, finishing all construction content 8 days ahead of the contract schedule, setting a new record for construction speed in China’s LPG sector. During construction, the project department innovatively implemented a "modular engineering design + integrated penetration management" model, front-loading construction planning, promoting multi-disciplinary collaborative optimization, and achieving efficient full-process coordination. Through the "Four 100-Day" phased target control system, it advanced progress while enhancing both quality and efficiency. All sub-divisional works met qualified standards, with a one-time pass rate for pipeline welding NDT reaching 99.3% and TOFD testing qualification rate for cryogenic tank steel plates reaching 98.7%. The project ranked first in safety and civilized construction among 48 key projects in Dongying, demonstrating exceptional technical and management capabilities.

  It is reported that this project is Dongying’s first low-temperature liquefied hydrocarbon storage facility, listed as a 2024 Shandong Province green low-carbon high-quality development key project. Phase I includes two 80,000-cubic-meter propane tanks, one 60,000-cubic-meter butane cryogenic tank, and supporting pipe racks, with an annual throughput of 2 million tonnes. Upon full completion, the throughput will exceed 4 million tonnes, providing stable raw material security for regional refining enterprises while enhancing supply chain safety and stability, and promoting circular development of C3 and C4 industrial chains.

图片2.png

Previous:
TCC Signs Digital Delivery Contract for Fujian Zhongsha Petrochemical
Next:
Central Control Room Handover for World's Largest Acetic Acid Project
Return
Who We Are
Company Profile
QHSE
Corporate Honors
Organizational Structure
What Can We Do
R&D
Engineering
Industry
Project Value Added Services
What Did We Do
Coal Chemical
Salt Chemical
New Chemical Material
GAS
Innovative Technology
Petrochemical
Environment Protection and Infrastructure
Power&Energy
What We Believe
Corporate Mission
Strategic Positioning
Corporate Vision
Core Values
Corporate Vision
Our Responsibility
News
Friend Links:China National Chemical Engineering Group Corporation (CNCEC)
Copyright © 2026 China Tianchen Engineering Corporation Tianjin ICP Registration No. 05009009-1
Privacy PolicyDisclaimerWebsite Map