• Home
  • Who We Are

    Who We Are

    Company Profile
    QHSE
    Corporate Honors
    Organizational Structure
  • What Can We Do

    What Can We Do

    R&D
    Engineering
    Industry
    Project Value Added Services
  • What Did We Do

    What Did We Do

    Coal Chemical
    Salt Chemical
    New Chemical Material
    GAS
    Innovative Technology
    Petrochemical
    Environment Protection and Infrastructure
    Power&Energy
  • What We Believe

    What We Believe

    Corporate Mission
    Strategic Positioning
    Corporate Vision
    Core Values
    Corporate Vision
  • Our Responsibility

    Our Responsibility

  • News

    News

CN
CN ES TR AR RU
HomeNews Fujian Zhongsha Gulei Project PC&BPA Joint Facility First Tower Hoisting Successfully Completed!

Fujian Zhongsha Gulei Project PC&BPA Joint Facility First Tower Hoisting Successfully Completed!

  • ArticleFrom:
  • Date:August 19, 2025
  • Share:

中沙2 - 副本.jpg

  Recently, a significant milestone was achieved in the PC&BPA joint facility of the Fujian Zhongsha Gulei Project, EPC-contracted by CNCEC-TCC. The core equipment—the cumene tower—of the cumene unit was successfully hoisted as a single unit after "insulation and cladding," marking the flawless completion of the first tower hoisting ceremony. The project has now entered the critical peak phase for equipment installation, establishing a robust foundation to ensure seamless progress throughout the remaining project lifecycle.


  The cumene tower is one of the core components of the facility. The project team employed the "single host lifting and feeding method," utilizing a hydraulic synchronous lifting system for high-precision displacement control. To ensure precise equipment positioning, the project team adhered to the philosophy of "planning first, technology-driven execution,"conducting multiple rounds of scheme demonstration and technical tackling.Through accurate calculations of crane operating radii and load distribution, along with refined obstacle-clearance plans for equipment transport and hoisting routes, they effectively overcame complex challenges including narrow site constraints and significant vertical lifting heights. Ultimately, the team accomplished this milestone with triple assurance in safety, quality, and efficiency.

中沙1 - 副本.jpg

Previous:
Successful First Ignition Achieved for Gasifier in Xinjiang Zhongtai Project Gasification Unit
Next:
CNCEC-TCC Signs EPC Contract for Egypt's First Photovoltaic Industry Chain Core Project
Return
Who We Are
Company Profile
QHSE
Corporate Honors
Organizational Structure
What Can We Do
R&D
Engineering
Industry
Project Value Added Services
What Did We Do
Coal Chemical
Salt Chemical
New Chemical Material
GAS
Innovative Technology
Petrochemical
Environment Protection and Infrastructure
Power&Energy
What We Believe
Corporate Mission
Strategic Positioning
Corporate Vision
Core Values
Corporate Vision
Our Responsibility
News
Friend Links:China National Chemical Engineering Group Corporation (CNCEC)
Copyright © 2026 China Tianchen Engineering Corporation Tianjin ICP Registration No. 05009009-1
Privacy PolicyDisclaimerWebsite Map