• Home
  • Who We Are

    Who We Are

    Company Profile
    QHSE
    Corporate Honors
    Organizational Structure
  • What Can We Do

    What Can We Do

    R&D
    Engineering
    Industry
    Project Value Added Services
  • What Did We Do

    What Did We Do

    Coal Chemical
    Salt Chemical
    New Chemical Material
    GAS
    Innovative Technology
    Petrochemical
    Environment Protection and Infrastructure
    Power&Energy
  • What We Believe

    What We Believe

    Corporate Mission
    Strategic Positioning
    Corporate Vision
    Core Values
    Corporate Vision
  • Our Responsibility

    Our Responsibility

  • News

    News

CN
CN ES TR AR RU
HomeNews Juzhengyuan (Jieyang) Acetic Acid Project 110kV Substation Successfully Energized on First Attempt

Juzhengyuan (Jieyang) Acetic Acid Project 110kV Substation Successfully Energized on First Attempt

  • ArticleFrom:
  • Date:August 19, 2025
  • Share:

  Recently, the 110kV substation for the Juzhengyuan (Jieyang) Acetic Acid Project—the world’s largest single-train acetic acid facility EPC-contracted by CNCEC-TCC—was successfully energized on the first attempt. This critical milestone lays a solid foundation for subsequent tasks, including energizing public utility substations, individual motor testing, commissioning of the plant-wide control system, and the project’s overall intermediate handover.

  The project is a key initiative under Guangdong Province’s Thousands-Hundreds-Tens Project". Its core components include a 1.5 MTA acetic acid unit, CO cryogenic separation and compression facilities, and auxiliary utilities. Upon completion, it will fill Guangdong’s acetic acid production gap, inject new vitality into local socioeconomic development, drive growth in related industries, and create significant employment opportunities. The 110kV substation—independently designed by TCC’s team—innovatively reconfigured electrical equipment layouts despite spatial constraints in both footprint and building height. This enabled a single structure to simultaneously serve dual functions: a plant-wide power distribution management system and a dedicated power distribution/transformation system for the acetic acid unit.

93f6a0d1d067727d243f55dadb4477c.jpg


Previous:
Successful First-Time Energization of 10kV Caustic Soda Substation in Hubei Yihua Caustic Soda Project
Next:
Successful First Ignition Achieved for Gasifier in Xinjiang Zhongtai Project Gasification Unit
Return
Who We Are
Company Profile
QHSE
Corporate Honors
Organizational Structure
What Can We Do
R&D
Engineering
Industry
Project Value Added Services
What Did We Do
Coal Chemical
Salt Chemical
New Chemical Material
GAS
Innovative Technology
Petrochemical
Environment Protection and Infrastructure
Power&Energy
What We Believe
Corporate Mission
Strategic Positioning
Corporate Vision
Core Values
Corporate Vision
Our Responsibility
News
Friend Links:China National Chemical Engineering Group Corporation (CNCEC)
Copyright © 2026 China Tianchen Engineering Corporation Tianjin ICP Registration No. 05009009-1
Privacy PolicyDisclaimerWebsite Map